
Measure G & C Construction Updates
Measures G and C Construction Updates
What are Measures G and C?
Measure G
On March 3, 2020, voters in the Foothill-De Anza Community College District’s service area approved by a 58.8% margin an $898 million general obligation bond measure to upgrade facilities preparing students/veterans for university transfer
and careers in fields such as healthcare, nursing, technology, engineering/sciences;
to upgrade and repair aging classrooms as well as labs for science, technology, engineering/math-related
fields of instruction; and to acquire, construct, repair facilities, equipment and
sites.
Measure C
On June 6, 2006, voters in the Foothill-De Anze Community College District's service area approved by a 65.69% margin a $490.8 million bond (Measure C).
These measures have and will enable the District to:
- Upgrade electrical, heating, ventilation systems, fire/seismic safety;
- Repair leaky roofs;
- Improve disabled access;
- Repair/expand classrooms;
- Upgrade technology; and
- Repair, construct, acquire, equip buildings, classrooms, libraries, sites, science/computer labs.
Read the 2018-19 annual Measure C report to the community.
For additional information, visit the Measure G and C Citizens' Bond Oversight Committee website.
Current Projects
Measure C Design Projects
- Lot 5B Modular Removal/Additional Parking
- B1900 MPOE
Measure C Construction Projects
- B1100 Wheelchair Lift Replacement
- B2500 Reroof
- Veteran's Rotary Plaza
Measure C Construction Projects
- District Office Building
Measure C Project Updates
Fall 2018
All major projects have been completed with the exception of the new district office building, which began construction January 2017. Estimated completion date is December 2018.
For location details, download construction map.
Personnel Office Moves on Main Campus
- Psychological Services, Campus Center to 5400 Student Resource
- Kristy Lisle, 1917 to 1918
- AVP Student Services, 8104 to 1917
- Teresa Ong, Sunnyvale Center to 1915

Questions?
We're Here to Help!
Audrey Capristo, FF&E Coordinator
650.949.7144
Building 1900, Office 1922
Other Measure C Foothill Contacts
- Bret Watson, VP of Finance and Administrative Services, 650.949.7364
- Tom Armstrong, Bond Director, 408.864.8289