subpage flowers image

Measure G & C Construction Updates

Measures G and C Construction Updates

What are Measures G and C?

Measure G


On March 3, 2020, voters in the Foothill-De Anza Community College District’s service area approved by a 58.8% margin an $898 million general obligation bond measure to upgrade facilities preparing students/veterans for university transfer and careers in fields such as healthcare, nursing, technology, engineering/sciences; to upgrade and repair aging classrooms as well as labs for science, technology, engineering/math-related fields of instruction; and to acquire, construct, repair facilities, equipment and sites.

Measure C

On June 6, 2006, voters in the Foothill-De Anze Community College District's service area approved by a 65.69% margin a $490.8 million bond (Measure C).

These measures have and will enable the District to:

  • Upgrade electrical, heating, ventilation systems, fire/seismic safety;
  • Repair leaky roofs;
  • Improve disabled access;
  • Repair/expand classrooms;
  • Upgrade technology; and
  • Repair, construct, acquire, equip buildings, classrooms, libraries, sites, science/computer labs.

Read the 2018-19 annual Measure C report to the community.

For additional information, visit the Measure G and C Citizens' Bond Oversight Committee website.

Current Projects

Measure C Design Projects
  • Lot 5B Modular Removal/Additional Parking
  • B1900 MPOE
Measure C Construction Projects
  • B1100 Wheelchair Lift Replacement
  • B2500 Reroof
  • Veteran's Rotary Plaza
Measure C Construction Projects
  • District Office Building

Measure C Project Updates

Fall 2018

All major projects have been completed with the exception of the new district office building, which began construction January 2017. Estimated completion date is December 2018.

For location details, download construction map.

 

Campus Map with construction areas

 

 

Personnel Office Moves on Main Campus

  • Psychological Services, Campus Center to 5400 Student Resource
  • Kristy Lisle, 1917 to 1918
  • AVP Student Services, 8104 to 1917
  • Teresa Ong, Sunnyvale Center to 1915
building with flowers

Questions?
We're Here to Help!

Audrey Capristo, FF&E Coordinator

650.949.7144


capristoaudrey@foothill.edu


Building 1900, Office 1922

Other Measure C Foothill Contacts
  • Bret Watson, VP of Finance and Administrative Services, 650.949.7364
  • Tom Armstrong, Bond Director, 408.864.8289


 

Top